| Task: Change the schedule.
 
 
 Steps:
 1. In the Notes client click the Replication/Sync icon on the left menu bar.
 
  
 
 2. On the Replication and Sync page, click Schedule --> Set Replication/Sync Schedule...
 
 
  
 
 
 3. In the schedule dialog, update the Repeat every (interval) settings as desired:
 - a. Make sure normal and high Replication/Sync intervals are checked/enabled.
 (e.g. change 60 minutes to 5 minutes for high-priority apps)
 - b. Click OK to save.
 
 
  
 
 
 4. As needed, choose an application to be high priority:
 Highlight and right-click an application. Choose Options.
 
 
  
 
 
 5. In the Options dialog, set the desired application priority:
 a. Click the Other tab on the left menu.
 b. Under Special replication limitations, click High.
 c. Click OK to save.
 
 
  
 
 
 
 previous page
 
 
 |